Drilling Borehole and Supervision
Year: 2024
Client: Save the Children
The objective of the assignment is to conduct the following activities:
- Drilling Borehole
- Casing installation
- Borehole Development and Pumping Test
- Water Quality Analysis (Regular Parameters)
- Characterized and evaluated Drilling Samples
.
Previous slide
Next slide